Lakeview Academy
​Victorville, CA

This project consisted of a full removal of a playground and a complete seal coat of the entire school, along with restriping of all the parking lots and playground at Lakeview Academy for the Victor Valley Unified School District. We pulverized the existing asphalt, excavated the site 10" deep, and exported all the material. We then installed a new section of 4" asphalt over 6" Class 2 base.

Road Repair
​Wrightwood, CA

This project consisted of two phases of construction. We removed and installed 4" asphalt over 6" Class 2 base on the south section of the road and then flipped the traffic to reconstruct the north section of the roadway.

Northrop Palmdale, CA

This project consisted of reconstruction of existing asphalt at Northrop Grumman in Palmdale. We pulverized all the existing asphalt, recompacted, and fine graded. We installed 12,000 tons of asphalt and striped all the parking lots and access roads.
Proudly powered by Weebly
  • Home
  • About
  • Company History
  • EMPLOYMENT OPPORTUNITIES
  • Contact
  • PROJECT GALLERY
    • Project Gallery 2
    • Project Gallery 3
    • Project Gallery 4
    • Project Gallery 5
    • Project Gallery 6
    • Project Gallery 7